发布时间:2016-03-10 07:32:20
制鞋机械安装及注意事项 Installation and usage
先安装脚架与桌面,将机器固定于桌面,再将脚踏开关接头由本体下方锁上。
Please install foot stand and table first, then fix machine on the table and lock the joint of foot pedal from its bottom.
使用单相220V电压。
Use 220V single phase voltage.
气压保持在4KG/M2。
Keep air pressure at 4KG/M2.
切勿使用利器以免刮伤胶槽内壁。
Don’t use sharp weapon to prevent it from scuffing the inwall of glue trough.
制鞋设备动作流程 Operation procedures
启动电热开关(P2-D)然后再将胶槽温控表(P2-B)调至所需温度(约160℃)后再调胶枪温控表(P2-A)调至所需温度(180~190℃)。
Start up electro thermal switch (P2-D) and adjust temperature control gauge (P2-B) of glue trough to the required (about 160℃), then adjust the temperature control gauge (P2-A) of glue gun to the required (180~190℃).
加温约20分钟左右,胶槽温度达到所需温度后,电源才会接至马达开关(P2-F)故在此时启动马达开关,马达才能转动,(若启动马达开关而马达不能转动表示胶槽温度未达到所需温度)。
Only heat the glue trough about 20 minutes to the required can the power can be connected to the motor (P2-F), and start up motor to make motor turn. (if motor not turns after turn on motor switch means temperature of glue trough failed to reach the required temperature).
关机时先关马达开关(P2-F),再关温度开关(P2-D)。
Turn off motor switch (P2-F) first, then the temperature switch the next (P2-D) when stop machine.
午休时间先关马达开关,胶槽及胶枪温度表调至120℃预温。
Please turn off motor switch and adjust temperature control gauge of glue trough and glue gun to 120℃ as preheat temperature during lunch break.
打开胶槽盖置入整块胶熔化喷用,当无胶时可再置入另一块胶,切勿余留太多胶在胶槽内加热,以免影响胶的品质。
Open the cap of glue trough to put a whole piece of glue in for melt. When there’s no glue, put another piece of glue. While don’t le***e too much glue to be heated in trough so as not to affect the quality of glue.
故障排除 Troubleshooting
问题 Trouble |
可能原因 Causes |
排除方法 Resoluti*** |
喷不出热熔胶 Can not spray hot melt glue |
三点组合气压不足 Pneumatic pressure of three-point combination not strong enough |
提升气压为3.5kg/cm2 Increase pressure to 3.5kg/cm2 |
热熔胶未完全熔化 Hot melt glue is not melted completely |
检视***丝及胶槽温度为160℃ Check the fuse and keep temperature of glue trough at 160℃ |
|
枪体温度不足 Temperature of gun body not enough |
检视***丝及枪体温度为190-210℃ Check the fuse and keep temperature of gun body at 160℃ |
|
喷嘴堵塞 Spray nozzle is blocked |
将喷嘴泡甲后以细铁丝通干净 Dip nozzle with toluene and clean it by fine steel wire |
|
铁氟龙气管内未通空气 Air not flows in the Teflon pipe |
检视电磁阀是否故障 Check whether the solenoid valve is broken or not |
|
马达未启动 Motor not start up |
检视***丝及启动器是否故障 Check whether the fuse or motor is broken |
|
喷胶面积太小 Glue-coating area is too ***all |
枪体温度不足 Temperature of gun body is not enough |
可再提升10℃ Increase 10℃ more |
枪体漏胶 Glue leaks from glue gun body |
枪体内部密合不足 Inside of gun body is not closed completely |
微调锁紧枪体上方长螺丝(P7-P6) Tighten the long screw (P7-P6) lightly |
枪体上盖内弹簧积炭 Inner spring of upper cap is blocked with carbon |
先清除积炭再加入1-2滴润滑油 Clean carbon first, then add 1-2 drops of lubricate oil |
|
枪体内部耐高温油封炭化 Anti-high temperature oil seal inside gun body is carbonated |
更换规格相符之耐高温油封 Change the anti-high temperature seal of proper specification |
|
机台漏胶 Glue leaks from machine table |
内部耐高温油封炭化 anti-high temperature oil seal inside is carbonated |
更换规格相符之耐高温油封 Change the anti-high temperature seal of proper specification |
使用注意事项 Cauti*** for usage
问题Cauti*** |
正确使用方法 Right using |
异常状况 Abnormal condition |
异常处理方法 Resoluti*** |
备注 Remarks |
温度 Temperature |
依胶槽规定温度&plu***n;10℃ &plu***n;10℃ according to required temperature. |
温度超高热熔胶会变黄或炭化 Hot melt glue may yellowing or be carbonated if temperature is too high |
Check whether gauge or heater tube is broken 清除胶槽内已变质热熔胶 Clean bad hot melt glue inside the trough
Put new glue in trough, reduce temperature for use |
变黄或炭化,则该热熔胶品质完全被*** If yellowing or carbonated, quality of hot melt glue gets bad |
胶量及均匀度 Glue amount and evenness degree |
依拉力强度调整喷量厚度并均匀涂布 Adjust spraying amount according to tension intensity and coat it evenly |
Not enough tension force
Covered with air after forming. |
Set standard coating amount according to coating position
Keep coating face even
Increase pressure properly |
胶量足够,喷补均匀,***是品质的保证 Enough glue, coating evenly and make sure good quality |
施工时间 Operation time |
依规定时间内加工完成并随室内温度下降(如冬天)而缩短时间 Decrease temperature (like winter) to shorten time according to required processing time |
应有粘度降低,影响贴合品质 Reduce required adhesion to affect attaching quality. |
Can not make fun blow to coating finished goods to prevent hot melt cooled quickly to shorten attaching time.
Adjust attaching time according the actual temperature in winter |
调整施工流程,配合喷胶速度,调度贴合人员操作 Adjust operation procedure, matching coating speed for attaching operation |
问题Cauti*** |
正确使用方法 Right using |
异常状况 Abnormal condition |
异常处理方法 Resoluti*** |
备注 Remarks |
材质 Material |
材质光滑或含离型剂,需增加胶量或双面涂布 Add glue or need double face coating for ***ooth material or that with parting chemical |
Can not glued;
Not enough tension force |
Double glue-spraying or coating
Add glue for important position
Adjust material |
***,溶剂涂布的材料较不适用适用。 Oily sheet, solution coated material is not suitable. |
热熔胶 Hot melt glue |
依原厂编号入库及领料使用。 Warehousing or receiving material according to code no. of original factory. |
Can not glued;
Not enough tension force
Hot melt glue gets bad |
胶槽内清除后再投入新胶 Put in new glue after glue trough cleaned. |
宜注意热熔胶性质,形状或编号,入库及领料的使用。 Pay attention to the quality, shape or code of hot melt glue and stock |
免责声明:以上信息由会员自行提供,内容的真实性、准确性和合法性由发布会员负责,产品网对此不承担任何责任。产品网不涉及用户间因交易而产生的法律关系及法律纠纷, 纠纷由您自行协商解决。
风险提醒:本网站仅作为用户寻找交易对象,就货物和服务的交易进行协商,以及获取各类与贸易相关的服务信息的平台。为避免产生购买风险,建议您在购买相关产品前务必 确认供应商资质及产品质量。过低的价格、夸张的描述、私人银行账户等都有可能是虚假信息,请采购商谨慎对待,谨防欺诈,对于任何付款行为请您慎重抉择!如您遇到欺诈 等不诚信行为,请您立即与产品网联系,如查证属实,产品网会对该企业商铺做注销处理,但产品网不对您因此造成的损失承担责任!
联系:304108043@qq.com是处理侵权投诉的专用邮箱,在您的合法权益受到侵害时,欢迎您向该邮箱发送邮件,我们会在3个工作日内给您答复,感谢您对我们的关注与支持!
东莞市奇峰液压科技有限公司 电话: 传真: 联系人:
地址: 主营产品:鞋机、前帮机、后帮机、中后帮机、压底机、钉跟机,结帮机,定型机,压合机,水压机,按摩机,液压机械,制鞋设备,制鞋机械,鞋机配件,广东鞋机
Copyright © 2025 版权所有: 产品网
免责声明:以上所展示的信息由企业自行提供,内容的真实性、准确性和合法性由发布企业负责。产品网对此不承担任何保证责任。
您好,欢迎莅临,欢迎咨询...